Premier Inn Leeds

Client  Wheatleys M&E   Sector    Commercial

The Challenge

Installation of 32 x 250w panels to cover 60M2 using Renusol configuration tool and PV Sol software. The building was modelled and the layout designed to cover 60 metres squared as required by a consultant. 

Due to the heigh of the building and the city centre location, the ballast required was over 400 blocks, which sit in the console bin underneath the panels.

As there are two CHP units on sire, a separate G59 relay was installed which connects the Baxi CHP units with our electrical works.